Welded Pipes Mills 02
Coils, Tig+ plasma welding to weld the tubes, on line annealing, removal of internal beads, cut, hydro test, ET and UT test for tubes.
Plates slitted, ends bevelled, SAW, Mig and Tig welding for the pipes.
Welded Pipes Mills 02
 
Tsisco Industrial Ltd.
 
Copyright © 2019 Tsisco Industrial Ltd. All rights reserved. | Privacy Policy |